Metro water new connection online application

CM Photo

Minister Photo

Chennai Metropolitan Water Supply and Sewerage Board

Rules/Procedure

Rules/Procedure

1 Upto G+2 / S+2 Buildings : For availing a new sewer connection use Ilanthorum Innaipu or AZhaithal Innaipu schemes
For availing a new sewer connection use the online application given in our website
2 Application Form
for S+3/G+3 and above
: i) Consumer can collect the Prescribed Application Form from the CMWSSB Head Office.(or)
ii) Also, it can be downloaded by clicking the below link

PDF Water/Sewerage Application Form - English

1 Application Form : Requisition by the applicant for issuing "concurrence" to Design Proposals of insitu-STP for the proposed development within CMA to be addressed to Managing Director.
2 List of Enclosures/Documents Details as per attached
PDF Annexure
3 Contact Office : Planning and Design Wing at Head Office of CMWSSB.
4 Scrutiny Fee : Rs.35,000/- (Rupees Thirty five Thousand Only) with service tax @ 12.36% to be paid in the form of Demand Draft in favour of "M.D, CMWSSB"
5 Nominal Time Taken For Issue Of Concurrence : 30 days

Address

No.1, Pumping Station Road, Chintadripet, Chennai-02.

Phone: 044-2845 1300
Email: cmwssb@tn.gov.in

Useful Links

Useful Links Footer

Other Links

Other Links

Our Newsletter

Subscribe to our newsletter

© Copyright Chennai Metropolitan Water Supply and Sewerage Board. All Rights Reserved Last reviewed and updated on 12-04-2023 Visitor's Count : 000653256
Acknowledgement

I have read the Standard Operating Procedures for Mechanized De-sludging of Septic Tanks and will abide with the same.